Powrót na górę
LPM 2009 - Live Performers Meeting

LPM 2009 - Live Performers Meeting

  • 595751 Wyświetlenia
  • Lubi

Brancaleone, Rome

Brancaleone, Roma, Italy

  • czwartek, 28 maja 2009 | VisualArena, Brancaleone, Roma, Italy
  • niedziela, 31 maja 2009 | Brancaleone, Roma, Italy

Città Invisibili

  • 8363 Wyświetlenia
  • Lubi
Città Invisibili
[Tekst dostępny tylko w języku angielskim] The entire work is conceived as an experiment of Doctor Laba (Riccardo La Barbera), that tries to manipulate the actions of the two puppet-dancers (Alessandra Marzo and Michele Gatta) with the help of his hunch-backed assistant (Fulvio Rifuggio).

Doctor Laba personally uses a lot of sophisticated sound devices to reach his mad aim, and in this way he controls the movements of his own creations, that are the two prototypic puppets.
The hunch-backed assistant, in the same way, helps Doctor Laba to give the entire experiment a changing and performative setting by using real-time video effects applied on public and puppets' actions.

At first puppets are completely passive, they do everything under the controls of Doctor Laba, but after a while they begin to take consciousness of their own identities and so they both try to resist the commands of their creator.

The technology passes through the public and dancers’ bodies creating new multiplied identities, every sound and image is now abyssally reverbed.
In this disintegrating and synaesthetic crescendo all the identities colour and fragment themselves infinitely.
Will it be a disrepair with no shape and no end?

Czas trwania (minuty)

30

Co jest potrzebne

PERFORMANCE STAGE

IMPORTANT: The total space of the performative room has to be minimum 15m x 12m.

The public is totally free to move in the performance stage.



MATERIALS TO BE MADE AVAILABLE:

THE STAGE MUST BE FREE OF SLOPES OR ANY DANGER

THE PERFORMATIVE SPACE MUST BE CLOSED SO TO OBTAIN A CONDITION OF COMPLETE DARKNESS

- The back wall and at least one side wall of the stage must be solid on impact and white suitable to videoprojections

- The floor must be in black and of a smooth material suitable for barefoot dancing

- A parallelepiped in white wood 50x50x70cm solid and you can trample

- 2 electrical flashlight

In case of any adaptation, be free to contact us.

VIDEO POSITION

n. 2 videoprojectors

n. 1 dvd player

n. 2 RCA audiovideo cables (15 meters)

n. 3 VGA video cables (15 meters)

n.2/3 multi-outlet sockets (15 input tot)

AUDIO POSITION

sound system powerfully appropriate for the stage

table 1,80m x 1m – h 0,80m

n.1 stage platform (facoltative) minimum 2m x 1,5m – h 0,70m

n.1 mixer 15ch jack input

n.2 monitor (cables min10 metres long)

n.2/3 multi-outlet sockets (15 input tot)

  • AV Performance
esppc
esppc

Italy Tricase, Roma

Wydarzenia

Wideo (1)